Road & Highway Crossings in Northeast Louisiana

The standard crossing — 80 to 400 feet, a few conduits, pavement untouched — runs through the region's machinery: the twin cities' ROW counters and the smaller municipalities from Bastrop to Farmerville, three parish public-works processes, and DOTD's utility permitting on the state system, where I-20's national corridor and the US 165 spine carry the weight. We build the package for the owner of record and put its genuine clock in the schedule.

The pricing conversation is the banks': a West Monroe crossing runs upland math, a Morehouse crossing runs backland math with the wet program attached, and in the historic gas belts the ledger check rides along — records pulled, legacy corridors asked about, the answer built into the plan rather than met by it.

Homeowner candor, network-standard and free: a run across your own open ground is trencher work, and we'll say so before quoting anything. Where public pavement forces the bore, real crossings start at a $10,000 minimum — rig, crew, locates, and traffic control cost what they cost on either bank.

Straight answers

Do you cross I-20?

Yes — DOTD's utility process with the bore plan attached and cover to its standard, filed to district clocks the corridor keeps steady. The river bridge's approach country adds structure-adjacent review where alignments near it; the quote carries the honest window.

What does the old gas field mean for a simple road bore?

Usually nothing — and occasionally everything, which is why the check exists: in the field's historic belts, legacy wells, gathering lines, and old easements can sit under alignments the maps call clean, so records work runs before the profile is drawn. It's a free scoping step here the way a water-table question is free on a coast.